Exhibition Stalls BD
FAQ

Frequently asked questions

General questions about working with us. For questions specific to a service, exhibition, or venue, see that page directly.

For major fairs like the Dhaka International Trade Fair, it is best to confirm space booking and begin design several months ahead of the event, since popular halls and pavilion positions are allocated early. For smaller sector-specific exhibitions, 6-10 weeks is often workable for a modular or semi-custom stand, though a fully custom build benefits from a longer lead time.

A modular stand uses a reusable structural system that can be reconfigured across multiple events, which lowers long-term cost for exhibitors attending several fairs a year. A custom stand is designed and built specifically for one event and one footprint, which allows for a more distinctive design but is typically a larger one-time investment.

Exhibition Stalls BD provides both — design and fabrication are handled as one coordinated process so that what is designed is what actually gets built, rather than being handed between separate vendors.

Yes. While Dhaka hosts the majority of Bangladesh's largest fairs, our project management and fabrication process is built to work with any venue's technical requirements nationwide.

An exhibition stand fabricator turns an approved design into a physical structure — sourcing and cutting materials, building the frame, printing and mounting graphics, wiring lighting and AV, and finishing surfaces to specification. At Exhibition Stalls BD, fabrication sits alongside design and installation under one team, so the drawing that gets approved is the structure that gets built.

Cost depends on booth size, design complexity, materials (wood, metal, or acrylic), height, lighting and LED requirements, furniture, the venue's technical rules, and the installation and dismantling schedule. We don't quote fixed per-square-metre prices publicly since these factors shift the total significantly — share your floor plan and requirements through the contact page for an itemised proposal.

Timeline depends on booth size and complexity, but every project follows the same sequence: brief, floor plan review, concept and 3D design, revisions and approval, technical drawings, fabrication, transport, on-site installation, and — after the show — dismantling. Confirming your show dates early gives enough lead time for design approval and workshop production before move-in.

Yes. Design, fabrication, on-site installation, and post-show dismantling are handled by one team under one schedule, coordinated with each venue's move-in and move-out timing — so there's a single point of contact from the first floor plan to the final teardown.

Yes — we design and fabricate stands for exhibitors at International Convention City Bashundhara (ICCB) and Bangabandhu International Conference Center (BICC), among other Bangladesh venues, working within each venue's technical and structural requirements.

A floor plan or booth location, your approximate booth size, the show name and dates, any design references or brand guidelines, and a general sense of what you need on the stand (meeting space, product display, AV, storage). Share these through the contact page and we'll scope the right approach.

Don't see your question here? Contact us directly and we'll answer it.
WhatsApp Call Us Email Us